{"id":1860,"date":"2026-09-07T14:24:44","date_gmt":"2026-09-07T14:24:44","guid":{"rendered":"https:\/\/boodecor.vn\/?p=1860"},"modified":"2026-09-07T14:24:44","modified_gmt":"2026-09-07T14:24:44","slug":"thi-cong-kien-truc-noi-that-nha-pho","status":"publish","type":"post","link":"https:\/\/boodecor.vn\/en\/thi-cong-kien-truc-noi-that-nha-pho\/","title":{"rendered":"Townhouse architecture and interior construction"},"content":{"rendered":"<h2 class=\"wp-block-wd-title title wd-4ee4072b\"><strong>Current full-package townhouse construction process<\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>First, obtain a building permit from the competent authorities.<\/li>\n\n\n\n<li>Prepare the house drawings and structural plans.<\/li>\n\n\n\n<li>Prepare a provisional cost estimate for the project.<\/li>\n\n\n\n<li>Prepare the site for house construction.<\/li>\n\n\n\n<li>Carry out the basic (structural) construction.<\/li>\n\n\n\n<li>Carry out the full-package finishing work of the project.<\/li>\n\n\n\n<li>Acceptance and inspection of the project.<\/li>\n\n\n\n<li>Hand over the project to the homeowner.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/boodecor.vn\/wp-content\/uploads\/2026\/09\/francesca-tosolini-qnSTxcs0EEs-unsplash-1200x800-1-1024x683.jpg\" alt=\"\" class=\"wp-image-1863\" style=\"aspect-ratio:1.5;width:1020px;height:auto\" srcset=\"https:\/\/boodecor.vn\/wp-content\/uploads\/2026\/09\/francesca-tosolini-qnSTxcs0EEs-unsplash-1200x800-1-1024x683.jpg 1024w, https:\/\/boodecor.vn\/wp-content\/uploads\/2026\/09\/francesca-tosolini-qnSTxcs0EEs-unsplash-1200x800-1-300x200.jpg 300w, https:\/\/boodecor.vn\/wp-content\/uploads\/2026\/09\/francesca-tosolini-qnSTxcs0EEs-unsplash-1200x800-1-768x512.jpg 768w, https:\/\/boodecor.vn\/wp-content\/uploads\/2026\/09\/francesca-tosolini-qnSTxcs0EEs-unsplash-1200x800-1-150x100.jpg 150w, https:\/\/boodecor.vn\/wp-content\/uploads\/2026\/09\/francesca-tosolini-qnSTxcs0EEs-unsplash-1200x800-1.jpg 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-1e7e4fef\"><strong>Learn the steps of building a townhouse with BOO D\u00e9cor<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-b871a581\"><strong>1. Rough construction<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-52c9ae2d\"><strong>1.1. Foundation construction\u00a0<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-872062be\">This is the first of the full-package house construction items today, namely building the basic foundation of the project.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-cad9c5d1\">This work determines the solidity of the whole project. It includes the reinforced concrete frame of columns, beams, floors, etc.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-e454695c\">This process requires an experienced construction team and quality workmanship to avoid affecting neighboring houses and to ensure the load-bearing capacity of the project.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-30874a28\"><strong>1.2. Building the superstructure<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-54a3f291\">Carry out the reinforced concrete frame, including columns, floor beams, stairs, etc.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-79b0676b\"><strong>1.3. Townhouse finishing stage\u00a0<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Bricklaying, plastering and painting<\/li>\n\n\n\n<li>Tiling and stone cladding<\/li>\n\n\n\n<li>Installation of aluminum doors, steel-core plastic doors, etc.<\/li>\n\n\n\n<li>Installation of railings: stairs, balustrades, etc.<\/li>\n\n\n\n<li>Hot and cold water system and fixtures.<\/li>\n\n\n\n<li>Installation of partitions: gypsum, tempered glass, etc.<\/li>\n\n\n\n<li>Installation of the skeleton frame and skylight roof for daylight.<\/li>\n\n\n\n<li>Completing wood-related items: stairs, doors, handrails, etc.<\/li>\n\n\n\n<li>Ceiling installation.<\/li>\n\n\n\n<li>Air-conditioning system installation.<\/li>\n\n\n\n<li>Furniture installation<\/li>\n\n\n\n<li>Cleaning up and handing the project over to the homeowner.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-464ce6e2\"><strong>1.4. Acceptance, completion and putting into use<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-2f4a35ab\">The acceptance process must meet conditions such as:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Complete statistics tables on related matters<\/li>\n\n\n\n<li>Regulations on the repair deadline<\/li>\n\n\n\n<li>Clearly stating the parties involved in the repairs<\/li>\n\n\n\n<li>Re-acceptance after repairs are finished<\/li>\n\n\n\n<li>If the project meets all requirements, it can be put into use<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"400\" src=\"https:\/\/boodecor.vn\/wp-content\/uploads\/2026\/09\/r-architecture-TRCJ-87Yoh0-unsplash-600x400-1.jpg\" alt=\"\" class=\"wp-image-1862\" style=\"aspect-ratio:1.5;width:600px;height:auto\" srcset=\"https:\/\/boodecor.vn\/wp-content\/uploads\/2026\/09\/r-architecture-TRCJ-87Yoh0-unsplash-600x400-1.jpg 600w, https:\/\/boodecor.vn\/wp-content\/uploads\/2026\/09\/r-architecture-TRCJ-87Yoh0-unsplash-600x400-1-300x200.jpg 300w, https:\/\/boodecor.vn\/wp-content\/uploads\/2026\/09\/r-architecture-TRCJ-87Yoh0-unsplash-600x400-1-150x100.jpg 150w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-efeef627\">Once the above steps are completed, the contractor will carry out the completion procedures and hand the house over to the homeowner, and the project is complete.<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-d739233d\"><strong>2. Townhouse construction price list<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"895\" height=\"560\" src=\"https:\/\/boodecor.vn\/wp-content\/uploads\/2026\/09\/Don-gia-thi-cong-2.png\" alt=\"\" class=\"wp-image-1861\" style=\"aspect-ratio:1.5982142857142858;width:895px;height:auto\" srcset=\"https:\/\/boodecor.vn\/wp-content\/uploads\/2026\/09\/Don-gia-thi-cong-2.png 895w, https:\/\/boodecor.vn\/wp-content\/uploads\/2026\/09\/Don-gia-thi-cong-2-300x188.png 300w, https:\/\/boodecor.vn\/wp-content\/uploads\/2026\/09\/Don-gia-thi-cong-2-768x481.png 768w, https:\/\/boodecor.vn\/wp-content\/uploads\/2026\/09\/Don-gia-thi-cong-2-150x94.png 150w\" sizes=\"auto, (max-width: 895px) 100vw, 895px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-abbb777e\"><strong>Guide to calculating the construction cost of a 1-storey townhouse of 40 m\u00b2 \u2013 60 m\u00b2<\/strong><\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-1ec4295a\">The construction cost of a 1-storey house of 40 m\u00b2 to 60 m\u00b2 is calculated as follows:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The unit price for design and rough construction at a fair full-package level is from 4,900,000 VND \u2013 5,700,000 VND<\/li>\n\n\n\n<li>Taking the average price of 5,300,000 VND\/m\u00b2<\/li>\n\n\n\n<li>Land area 4 m x 13 m = 52 m\u00b2<\/li>\n\n\n\n<li>Ground-floor construction area of 40 m\u00b2: 40 x 5,300,000 = 212,000,000 VND.<\/li>\n\n\n\n<li>Foundation 40 m\u00b2 x 30% = 30% x 212,000,000 = 63,600,000 VND<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-ae9afed6\"><strong>Suy ra:<\/strong>\u00a0Construction cost of a 40 m\u00b2 townhouse = 212,000,000 + 63,600,000 = 275,600,000 VND, plus additional costs for the front yard (estimated at around 25 million)<\/p>\n\n\n\n<p class=\"wp-block-wd-paragraph wd-791512b7\">BOO Decor is one of the providers of townhouse design and construction services, offering customers one of the most affordable townhouse construction price lists today. With our experience, we will certainly satisfy you and deliver the best projects. If you need townhouse design and construction, please contact us via the hotline 0963.350.560 for support.<\/p>","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":1863,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[82],"tags":[],"class_list":["post-1860","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-thi-cong-noi-that"],"_links":{"self":[{"href":"https:\/\/boodecor.vn\/en\/wp-json\/wp\/v2\/posts\/1860","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/boodecor.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/boodecor.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/boodecor.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/boodecor.vn\/en\/wp-json\/wp\/v2\/comments?post=1860"}],"version-history":[{"count":1,"href":"https:\/\/boodecor.vn\/en\/wp-json\/wp\/v2\/posts\/1860\/revisions"}],"predecessor-version":[{"id":1864,"href":"https:\/\/boodecor.vn\/en\/wp-json\/wp\/v2\/posts\/1860\/revisions\/1864"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/boodecor.vn\/en\/wp-json\/wp\/v2\/media\/1863"}],"wp:attachment":[{"href":"https:\/\/boodecor.vn\/en\/wp-json\/wp\/v2\/media?parent=1860"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/boodecor.vn\/en\/wp-json\/wp\/v2\/categories?post=1860"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/boodecor.vn\/en\/wp-json\/wp\/v2\/tags?post=1860"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}